SR 368/23rd Street Widening and Bridge Improvements
Service
SR 368/23rd Street from U.S. 98 Flyover to SR 390/St. Andrews Boulevard
Service(s) Provided
PD&E
Client
FDOT District 3
Project Dates
2023 – 2026
Budget/Cost
$1.5 Million
Metric conducted a Project Development and Environment (PD&E) Study for SR 368/23rd Street from the U.S. 98 Flyover to SR 390/St. Andrews Boulevard in Panama City, Florida. The study evaluated widening the existing four-lane undivided roadway to a six-lane divided highway with bicycle and pedestrian facilities throughout the project corridor. Improvements also included widening or replacing the Posten Bayou Bridge.
As part of Florida’s Strategic Intermodal System (SIS), SR 368 provides a direct connection between Port Panama City and its off-site Intermodal Distribution Center. Metric developed the preferred alternative to improve roadway capacity and multimodal connectivity while avoiding impacts to a nearby park and wastewater treatment plant.





