I-75 @ U.S. 301 Interchange Widening

I-75 (SR 93) at U.S. 301 Interchange Widening

Service(s) Provided

CEI

Client

FDOT District 1

Project Dates

2020 – 2025

Budget/Cost

$140 Million

This design-build (DB) project widened over 4.3 miles of I-75 from six to eight lanes, adding auxiliary lanes and inside full-depth shoulders between SR 64 and U.S. 301. The project also converted the existing I-75 interchange at U.S. 301 from a partial cloverleaf to an enhanced tight diamond interchange, consistent with the approved Interchange Access Request and PD&E.

The project included reconstructing all ramps and building two new parallel bridges over the Manatee River for the new northbound I-75 exit ramp and southbound entrance ramp. The new ramp bridges include full-width stub-outs to accommodate three general-use lanes as part of the future ultimate 10-lane I-75 section.

U.S. 301 was reconstructed and widened from east of 51st Avenue to west of 60th Avenue to provide three eastbound travel lanes, four westbound travel lanes, turn lanes at all new access ramps and side streets, and sidewalks on both sides of the roadway.

Scroll to Top