Turnpike Connected Vehicle Pilot Project
Service
Connected Vehicles (CV) Deployment
Service(s) Provided
Technology
Client
Florida’s Turnpike Enterprise (FTE)
Project Dates
2020 – 2022
Budget/Cost
$499 Thousand
As a task work order under Metric’s Florida’s Turnpike Enterprise (FTE) DW Continuing Services ITS Consultant contract, Metric provided stakeholder coordination through industry outreach, design analysis, and preparation of final construction plans and specifications for deploying connected vehicle (CV) technology devices on Turnpike system facilities.
The design and construction documents were based on a CV Readiness Study and Implementation Plan previously developed by Metric, which identified potential deployment projects. The planned device installation locations covered the Beachline (SR 528) from milepost 0 to milepost 8 and the Turnpike Mainline (SR 91) from milepost 255 (Orlando South Interchange) to milepost 267 (SR 408 Interchange). Roadside CV devices were designed for installation, where feasible, on existing dynamic message sign (DMS) structures, closed-circuit television (CCTV) poles, and traffic signal mast arms.
Additional services included field reviews, industry coordination and information sharing, collaboration with CV equipment vendors on onboard unit (OBU) and roadside unit (RSU) solutions, radio frequency (RF) surveys, utility and environmental coordination, and preparation of a final CV Deployment Report.