SR 821 (HEFT) Widening

SR 821 (HEFT) Widening From North of SW 184th St. (Eureka Dr.) to South of SW 104th St/SR 990 (Killian Pkwy.) (Subcontractor Role)

Service(s) Provided

Technology/TSM&O

Client

Florida’s Turnpike Enterprise (FTE)

Project Dates

2014 – 2016

Budget/Cost

$145 Million

Metric provided design services for ITS, lighting and Signals, in addition to testing and integrating the ITS system. The project consisted of widening SR 821, including the addition of three general-purpose lanes and two express lanes in each direction, as well as auxiliary lanes where required.

Improvements spanned from north of SW 184th Street (Eureka Drive) to north of SW 72nd Street (Sunset Drive), including the extension of SR 874 through the SR 821 interchange. The project addressed future capacity, operational, and safety needs, encompassing mainline lane additions, ramp lane improvements, corridor operational enhancements, and surface street upgrades.