Okeechobee
Service
SR 25 / US 27 / Okeechobee Rd from E. of NW 116 Way to E. of NW 87 Ave
Service(s) Provided
Roadway
Client
FDOT
Project Dates
June 2016 - Present
Budget/Cost
$214 Million
This high-profile project involved the reconstruction of SR 25/ US 27/ Okeechobee Road using rigid pavement from MP 8.146 to MP 9.340. The overall roadway design efforts on this project involve the reconstruction of multiple roads along the corridor, including NW South River Drive, NW 87th Avenue, NW 106 Street, Ramp H, and NW 105th Way. Metric’s role, as a subconsultant to BCC Engineering, is to provide roadway design, signing and pavement markings plans, traffic evaluation, environmental services, and ITS design.