U.S. 90 Corridor Alternative Evaluation and PD&E Study
Service
U.S. 90 Corridor from Glover Lane to SR 87S
Service(s) Provided
PD&E
Client
FDOT District 3
Project Dates
2013 – 2018
Budget/Cost
$2.5 Million
This Project Development and Environment (PD&E) Study included preparing an Alternative Corridor Evaluation (ACE) to assess potential corridors that would alleviate traffic congestion along U.S. 90 in downtown Milton.
The study was classified as an Environmental Assessment (EA) and included an Individual Section 4(f) Evaluation to address potential impacts to historic resources. Additional project elements included evaluating a bridge replacement over a tidally influenced waterway and conducting formal consultations with the U.S. Fish and Wildlife Service (USFWS) and the State Historic Preservation Office (SHPO).