U.S. 90 Corridor Alternative Evaluation and PD&E Study

U.S. 90 Corridor from Glover Lane to SR 87S

Service(s) Provided

PD&E

Client

FDOT District 3

Project Dates

2013 – 2018

Budget/Cost

$2.5 Million

This Project Development and Environment (PD&E) Study included preparing an Alternative Corridor Evaluation (ACE) to assess potential corridors that would alleviate traffic congestion along U.S. 90 in downtown Milton.

The study was classified as an Environmental Assessment (EA) and included an Individual Section 4(f) Evaluation to address potential impacts to historic resources. Additional project elements included evaluating a bridge replacement over a tidally influenced waterway and conducting formal consultations with the U.S. Fish and Wildlife Service (USFWS) and the State Historic Preservation Office (SHPO).