SR 408 PD&E Study

SR 408 PD&E Study from Woodbury Road to the SR 50/SR 520 Intersection

Service(s) Provided

PD&E

Client

CFX

Project Dates

2015 – 2017

Budget/Cost

$3.2 Million

This Project Development and Environment (PD&E) Study prepared a Preliminary Environmental Impact Report (PEIR) for the Central Florida Expressway Authority’s (CFX) proposed seven-mile extension of SR 408 in Orange County.

The study evaluated multiple expressway extension alternatives, including co-location along SR 50 and new alignments developed through an Alternative Corridor Evaluation (ACE). The analysis considered alternative corridors, roadway alignments, interchange configurations, and a new bridge over the Econlockhatchee River, an Outstanding Florida Water (OFW).

The study balanced transportation needs with potential impacts to sensitive environmental resources, including conservation easements, wetlands, and floodplains, as well as utilities, residential properties, businesses, and community facilities, including those serving minority communities. Extensive public outreach included engagement with Environmental and Project Advisory groups.

Scroll to Top