I-95, I-395, and SR 836 Infrastructure Improvements

I-95, I-395, and SR 836 Infrastructure Improvements

Service(s) Provided

ITS/Traffic

Client

FDOT District 6

Project Dates

2019 – 2024

Budget/Cost

$802 Million

This $802 million design-build project combined three concurrent projects led by the Archer Western–de Moya (AW-dMG) Joint Venture to minimize impacts to the public. Metric served as a key design team member for structures, intelligent transportation systems (ITS), traffic signals, roadway, and drainage elements.

I-95 Concrete Replacement Project

The project extended along I-95 from NW 8 Street to NW 29 Street and included replacing the concrete pavement across the northbound and southbound travel lanes. The team also added a seventh northbound lane to accommodate traffic from the eastbound SR 836 ramp to northbound I-95 and improve traffic flow through the Midtown Interchange. These improvements enhanced safety, ride quality, and pavement durability.

I-395 Improvements

The improvements extended approximately 1.4 miles from the SR 836/I-95/I-395 Midtown Interchange to the MacArthur Causeway. The project reconstructed the existing interstate and built a signature bridge spanning 1,025 feet over NE 2 Avenue and SR 5 (Biscayne Boulevard). Featuring six sweeping arches, the bridge created a distinctive addition to the Miami skyline.

The bridge’s high vertical clearance opened approximately 55 acres beneath I-395 for public spaces serving Overtown residents, nearby communities, and visitors. The project also provided three through lanes in each direction and separate connector ramps to and from I-95. The existing eastbound I-395 off-ramps at NE 2 Avenue were relocated west to North Miami Avenue, as were the westbound on-ramps at NE 1 Avenue. NW 2 Avenue was also reconnected beneath I-395 to improve neighborhood access.

SR 836 Improvements

Extending from NW 17 Avenue to the Midtown Interchange, this project continued the modernization of the SR 836 corridor. Improvements included constructing an elevated viaduct beginning just east of the toll gantry at NW 17 Avenue. The viaduct rose over the center of SR 836, allowing drivers to bypass the I-95 Interchange before connecting to I-395 east of I-95.

The viaduct provided two lanes in each direction for drivers traveling east toward Watson Island, PortMiami, and Miami Beach, allowing them to bypass the Midtown Interchange and its ramps. The existing SR 836 roadway and bridges functioned as a collector-distributor system, helping drivers access local roads and I-95 while reducing weaving movements and improving safety and traffic operations. The existing eastbound SR 836 ramp to northbound I-95 was also widened to add a lane and help reduce congestion.