US 90 Corridor from Glover Lane to SR 87S

US 90 Corridor from Glover Lane to SR 87S

Service(s) Provided

PD&E

Client

FDOT District 3

Project Dates

: October 2013 – March 2018

Budget/Cost

$2.5 Million

This PD&E project involved the preparation of an Alternative Corridor Evaluate (ACE) and evaluation of numerous corridors that would alleviate traffic along US 90 in downtown Milton. This study had a class of action of Environmental Assessment and included an Individual Section 4(f) Evaluation due to impacts to historic resources, bridge replacement over a tidally influenced waterway, and formal consultation with USFWS and SHPO.

Scroll to Top